9978922078 / 0261-2262031

Unique Construction

Unique Construction - Surat Gujarat

 
 

Bridge Projects

 
 

CABLE STAYED BRIDGE ATHWALINES – ADAJAN, SURAT

adajan-bridge-surat
Cable Stayed Bridge
Construction of Cable Stayed Bridge at balance portion of existing bridge on Tapi river joining Athwalines – Adajan in Surat.
Client : Surat Municipal Corporation
918m Length of Bridge

SARDAR BRIDGE ATHWALINES – ADAJAN, SURAT

sardar-bridger-surat
River Bridge with Girder Launching Method
Construction for widening on both sides of Sardar Patel river bridge joining Athwa — Adajan on river Tapi at Surat on EPC basis (design, engineering, procurement and construction)
Client : Surat Municipal Corporation
760 m U/S & 772m D/S Bridge Length

FOUR LANING BALANCE CANTILEVER BRIDGES, PUNJAB

PUNJAB FOUR LANING-unique
Perennial Water Canal Bridge
Four laning of Pathankot – Amritsar section of NH-15 from km 6+082 to km 108+502 in the state of Punjab under NHDP phase III B on DBFOT basis. Major Bridge across Hydel Channel at Ch. 11+920 Km. & UBDC Channel at Ch. 51+980 Km.
Client : National Highway Authority of India, & Mordern Road Makers Pvt. Ltd. Subsidery of I.R.B.Mumbai
137 m length each bridge

BRIDGE ON RIVER TAPI NR. KATHOR VILL. NH-8

BRIDGE ON RIVER TAPI
Tapi River Bridge
Additional three lane bridge with its approaches & improvement of the existing bridge proper & its approaches river Tapi in km 246/4-8 on NH-8 Nr. Kathor Village, Surat.
Client : Project Director NHAI, PIU-Vadodara & Mordern Road Makers Pvt. Ltd. Subsidiary of I.R.B.Mumbai
440 m length of bridge

KAALI RIVER BRIDGE AT KARNATAKA

KARNATAKA
River Bridge
Four Lanning of Goa/ Karnataka Border to Kundapur Section NH-17 from km. 93.700 to Km 283.300 in the state of Karnataka under NHDP phase IV on DBFOT basis. “Construction of Kaali River Major Bridge (CH. 102+470)”

Client National Highway Authority of India, & Mordern Road Makers Pvt. Ltd. Subsidery of I.R.B.Mumbai

665.8 m length of bridge

PARLE POINT FLY-OVER BRIDGE

parle_point
Fly-over Bridge
Construction of Fly-over Bridge at Parle Point Junction on Surat – Dumas Road, Surat.

Client Executive Engineer (Bridge), Surat Municipal Corporation
2186.79 m (Two lane) length of bridge

APPROACH BRIDGE AT SARTHANA RADIAL WELL

SARTHANA RADIAL WELL
Approach Bridge
Construction and 5 years Operation and Maintenance Contract for 02 (TWO) nos. of 45MLD Radial Collector Wells and ancillary works in River Tapi at Upstream of Sarthana Water Works for Surat Municipal Corporation (SMC) at Suart, Gujarat.
Client Project Director NHAI, PIU-Vadodara & Mordern Road Makers Pvt. Ltd. Subsidiary of I.R.B.Mumbai
477+483 = 960 mtr. length of bridge

FLY-OVER BRIDGE AT KAMREJ JUNCTION NH8

KAMREJ FLY-OVER BRIDGE
Fly-over bridge

Construction of Flyover @ km. 249/581 & 260/705 including Pedestrian underpass & Kadodra khadi river bridge (260/397) & Panjar Khadi river bridge (244/780) (Project chainages) in Six/Four-laning of Km. 198/000 to km. 263/000, Bharuch to Surat section of NH-8 in Gujarat state (Package-2)

Client Chief General Manager, NHAI & Modern Road Developers Subsidiary IRB, Mumbai.
168m length of bridge

FLY-OVER BRIDGE AT KADODRA JUNCTION NH8

KADODRA FLY-OVER BRIDGE
Fly-over bridge

Construction of Flyover @ km. 249/581 & 260/705 including Pedestrian underpass & Kadodra khadi river bridge (260/397) & Panjar Khadi river bridge (244/780) (Project chainages) in Six/Four-laning of Km. 198/000 to km. 263/000, Bharuch to Surat section of NH-8 in Gujarat state (Package-2)
Client Chief General Manager, NHAI & Modern Road Developers Subsidiary of IRB, Mumbai.
168m length of bridge

RAILWAY OVER BRIDGE OF PATHANKOT – AMRITSAR SECTION

RAILWAY OVER BRIDGE
Railway Over Bridge
Construction of balance Superstructure portion of ROB at Ch. 42+466 & Ch. 51+533 on ongoing project “Four laning of Pathankot – Amritsar section of NH-15 from km 6+082 to km 108+502 in the state of Punjab under NHDP phase III on BOT basis.
Client National Highway Authority of India, &
J.J. Patel Infrastructural & Engineering Pvt. Ltd. Subsidery of I.R.B.Mumbai
Length of Bridge 50.5 mtr.

CREEK BRIDGE AT PANJAR KHADI

creek-bridge
Creek Bridge
Construction of Flyover @ km. 249/581 & 260/705 including Pedestrian underpass & Kadodra khadi river bridge (260/397) & Panjar Khadi river bridge (244/780) (Project chainages) in Six/Four-laning of Km. 198/000 to km. 263/000, Bharuch to Surat section of NH-8 in Gujarat state (Package-2)
Client : Chief General Manager, NHAI & Modern Road Developers Subsidiary IRB, Mumbai
56.35 m length of bridge

FLY-OVER BRIDGE AT MAGDALLA

fly-over-surat
Fly-over Bridge
A/6 LANING OF GUJARAT/ MAHARASHTRA BORDER SURAT-HAZIRA PORT SECTION OF NH6 IN THE STATE OF GUJARAT UNDER NHDP PHASE III ON DBFO BASIS FROM KM 0+000 TO 132+913
Client : National Highways Authority of India & Isolux Corsan India
100 m length of bridge
 
 

Road Projects

 
 

BRTS ANUVRAT DWAR TO KHARWARNAGAR, SURAT

BRTS ANUVRAT DWAR - KHARWARNAGAR

Bus Rapid Transit System
Development of BRT Corridor from Anuvrat Dwar to Kharvarnagar, for Surat BRTS project
Client Surat Municipal Corporation
4.353 Km Road Length

BRTS KATARGAM TO KOSAD, SURAT

BRTS KATARGAM - KOSAD
Bus Rapid Transit System
Development of BRT Corridor from Katargam Darwaja to Kosad for package-9 for Surat BRTS phase-II
Client Surat Municipal Corporation
6.00 Km Road Length

BRTS SIMADA TO SARTHANA, SURAT

BRTS SIMADA-SARTHANA

Bus Rapid Transit System
Development of BRT Corridor from Simada unction to Sarthana, for Surat BRTS project
Client Surat Municipal Corporation
2.5 Km Road Length
 
 

Water Supply Projects

 
 

SARTHANA RADIAL WELL

SARTHANA RADIAL WELL

Radial Collector Well
Construction and 5 years Operation and Maintenance Contract for 02 (TWO) nos. of 45MLD Radial Collector Wells and ancillary works in River Tapi at Upstream of Sarthana Water Works for Surat Municipal Corporation (SMC) at Suart, Gujarat.
Client : Surat Municipal Corporation

2 Nos. of 12m Dia. Well and 21.038m Sinking
 
 

Irrigation Projects

 
 

KHARWARNAGAR TO SIMADA CANAL WORK, SURAT

PARLE POINT FLY-OVER BRIDGE-gov-unique

R.C.C. Canal Work
Construction of RCC Precast/Cast in situ box and ancillary work related to it for the remaining work in canal (4600.0 RM) from Kharwarnagar junction to Simada junction BRT corridor including providing & laying of precast slab (800 RM) as and where required.(where there is a problem of ROW).
Client : Surat Municipal Corporation
4.6 Km Length of Canal

ANUVRAT DWAR TO ONGC CANAL WORK, SURAT

R.C.C. Canal Work
Construction of RCC Precast/Cast in situ box and ancillary work related to it for the Canal from Anuvrat Dwar junction to ONGC junction (Nr. TGB Hotel) via Bharthana junction (Around 6.25 K.M. length).
Client : Surat Municipal Corporation
6.25 Km Length of Canal
 
 

Drainage Projects

 
 

SEWAGE PUMPING STATION AT VESU

VESU SEWAGE PUMPING STATION

Underground Pumping Station
Construction of Intermediate Sewage Pumping Station for Vesu Sewage Scheme under JnNURM Scheme.
Client : Executive Engineer (Drainage),
Surat Municipal Corporation.
2 Nos. of 14m Dia. Well and 14m Sinking

83 MLD SEWAGE PUMPING STATION AT KOSAD

83 MLD KOSAD SEWAGE

Underground Pumping Station
Construction of 83 MLD Sewage Pumping Station at Kosad for the new north drainage scheme, Surat, Under JnNURM Scheme.

Client : Executive Engineer (Drainage),
Surat Municipal Corporation
24m Dia. of Well and 14m Sinking

57 MLD SEWAGE PUMPING STATION AT KOSAD RAILWAY

KOSAD RAILWAY 57 MLD SEWAGE

Underground Pumping Station
Construction of 83 MLD Sewage Pumping Station at Kosad for the new north drainage scheme, Surat, Under JnNURM Scheme.

Client : Executive Engineer (Drainage),
Surat Municipal Corporation
20m Dia. of Well and 15m Sinking
 
 

Residential & Commercial Projects

 
 

INDUSTRIAL BUSINESS COMPLEX AT BHATAR

BHATAR INDUSTRIAL BUSINESS COMPLEX

Business Complex
Turnkey Basis including design industrial business complex at Bharat Char Rasta, Surat
66000 Sq.ft. Construction

OFFICE COMPLEX, ADAJAN

OFFICE COMPLEX, ADAJAN

RCC low-rise frame structure
Construction of Office Building with R.C.C low-rise frame structure.
40000 Sq. ft.
 
 
 
 

KEY PERSON

 
 

Qualification and experience of key personnel

Position
Name
Qualification
Year of experience (General)
PartnerMr. Paresh R. Patel
M Tech
18 Yr.
General Manager
Contracts
Mr. Rajeev Awasthi
B. E. Civil
30 Yr
General Manager
QS
Mr. Jayraj Hajare
Diploma Civil
22 Yr.
General Manager
Finance
Mr. Vasantbhai Patel
B. Com
20 Yr.
General Manager
Site
Mr. Rajendra Patel
B. Com
12 Yr.
General Manager
Admin & Contracts
Mr. Nayan Tailor
B. Com
10 Yr.
Dy. General Manager
Mechanical
Mr. Chirag Gohil
M. Com
6 Yr.
Sr. Project Engineer
Mr. Ravi Patel
Diploma Civil
3 Yr.
Sr. Project Engineer
Mr. Alpesh Patel
Diploma Civil
3 Yr.
Sr. Project Engineer
Mr. Rajesh Rathod
Diploma Civil
13 Yr.
Sr. Project Engineer
Mr. Saurabh Kapadia
B. E. Civil
1 Yr.
Sr. Project Engineer
Mr. Hardik Patel
Diploma Civil
3 Yr.
Sr. Project Engineer
Mr. Pankaj Patel
Diploma Civil
5 Yr.
Sr. Project Engineer
Mr. Divyang Patel
Diploma Civil
4 Yr.
Quality Engineer
Mr. Nilay Chowdhari
Diploma Civil
5 Yr.
Surveyor
Mr. Sanjay Patel
Diploma Civil
10 Yr.
Site Engineer
Mr. Raju
Diploma Civil
1 Yr.
Site Engineer
Mr. Mohit Reshamwala
Diploma Civil
4 Yr.
Site Engineer
Mr. Jitendra Patel
Diploma Civil
2 Yr.
Translate »